2009-08-21 - Our Redwood City (SQL1) data center has had a power outage. (all times PDT)
Most mission critical systems are up. If you know of something that's down, please send an email to hands @ isc . org .
7:45 pm - Power goes out - routing unavailable
8:40 pm - R1.SQL1 and firewalls back up - most equipment down
8:50pm - farside is back up - power to servers being restored as UPSs charge up
10:00pm - most machines are back up
The work on our Redwood City data center is complete for now. Apart from the outstanding
new router hardware issue, and some minor tidy-ups, the upgrades are now complete. We are
currently working with our router vendor to diagnose the issues we had with our core
router and will attempt cutting over to this again in future when these are resolved.
A new F-Root node has recently been installed in Philipsburg, on the island of Sint Maarten, Netherlands Antilles. If you are present at OCIX or going to be connected please setup peering with us there if you are not already doing so. You can use our web form for this.
A new F-Root node has recently been installed in Frankfurt connected to the DE-CIX, so please setup peering with us there if you are not already doing so. You can use our web form for this.
ISC's F-Root node in Munchen, Germany is currently partially down
due to hardware failure. ISC is working on getting the node back
up as soon as possible.